Improved control over dimensions
This release extends the manual selection of dimension values feature to all tools within Ipiphany. It also adds the ability to control how date dimensions are broken down. You can now choose to report by Day, Week, Month, Quarter, or Year.
Tip - To change how charts break down a date dimension either set it from the 'Date Period' setting in the status bar or open the 'Report Period' control and select to display by DAYS | WEEKS | MONTHS | QUARTERS | YEARS then click Apply.
Other Changes
Updated the 'Ad-hoc' Analysis report type to better facilitate comparing the displayed value between the second and subsequent levels of the Insight tree
Changed 'Another Attribute' option in the 'Report By' control to 'Other Attribute' to make it clear that this is for selecting a different attribute rather than an additional attribute
Added the ability to drag and drop date filter chips to the Filter and Report Period controls
Fixes
Fixed the alignment of the Create Analysis button in the Crosstab > Table
Fixed Insight descriptions not always updating correctly in the Analysis Report
Fixed the some control buttons not aligning correctly in Firefox
Fixed the Analysis Edit popup not closing when you switch tools
Fixed Insights not carrying over the text casing when being created from Concepts
Fixed an issue where new users in specific zones could not view shared Projects
Fixed being displayed the Login screen after successfully resetting password rather than being automatically logged in
If you have any questions or comments on this release or anything Ipiphany related let us know.